Originally Posted by Chris R
Last time I talked to Neil about it the technology to even run the I75 board is antiquated and no longer supported (similar to the old game scores on the end zone boards inside the Arena). There were no specific funds to re-do it right away in the Arena reno, but were savings found during the process, it would be looked into.
Im sure Daktronics makes a solution for it. All it takes is someone with a large enough checkbook.
I agree about the acid-washed/painted concrete inside. Whatever they did or however they did it, it looks 100% better. The old concrete looked dark and dirty like a cell block on Alcatraz.
|
Chris, I was told that they fixed all of the "nicks" in the concrete then sprayed an epoxy. I was there the other day and got a sneak peek - looks awesome.