UDPride Discussion Forums    
     

Go Back   UDPride Discussion Forums

» Log in
User Name:

Password:

Not a member yet?
Register Now!
» Advertisement
View Single Post
  #78  
Old 05-11-2017, 03:09 PM
Flyer2 Flyer2 is offline
Major
 
Join Date: Sep 2007
Posts: 702
Thanks: 302
Thanked 330 Times in 192 Posts
Flyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond reputeFlyer2 has a reputation beyond repute
Originally Posted by NorthwestFlyer View Post
30 days to get through a building permit for a $12 million renovation is actually pretty efficient considering there are likely several engineering and utility disciplines and pier reviews that happen on something like this.
Those Pier reviews are for the boat landing coming off the river.

Its my wise a..s day.
Reply With Quote
Mad Props to Flyer2 For This Totally Excellent Post:
ud69 (05-11-2017)
 
Powered by vBadvanced CMPS v3.2.1

All times are GMT -4. The time now is 05:14 AM.


Powered by vBulletin® Version 3.8.6
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Advertisement System V2.6 By   Branden

     
 
Copyright 1996-2012 UDPride.com. All Rights Reserved.