Originally Posted by CE80
Ground control to Major Figgie
Ground control to Major Figgie
|
The King denied my requisition form for a quad-copter with a camera, so it wasn't me.
In the last week, north entrance doors have been installed, steel support for windows on the second floor of the south entrance, metal siding on the south side of the east walkway area, and windows installed in 4 of the 5 sections on the east wing. Here is a shot of the southeast area over the fencing closer to the arena. Sidewalks also look to have been poured in the last 2 weeks, must have missed that last week.
A few more pics at
Figstats.