It appears that the fire did not stop any construction work.
Roof on the 400 walkway is on, most, if not all, windows installed on northeast side, brickwork beginning on north entrance side, more steel structure on the south entrance side, and support structure for windows on new south east main entrance.
Here is the shot of the northeast side of the arena with brickwork and windows installed.
5 more images at
Figstats.