Ok, I've been slacking off on posting pictures. They've added some good structure on the east end walkway, and you can see a bit of the design that will be there. More windows on the main entrance, and the south entrance has more structure for the circular concourse as well as for vertical brickwork. On the northside the second floor window steel structure looks to be close to complete. Maybe windows will go in this week.
Here is a look from the northeast corner.
More pictures at
Figstats.